In what cases is an urgent delay required in construction. The list of construction works for which a permit is required in the SRO. Which firms may not join the SRO

1) Firstly, individuals and legal entities without any restrictions can perform any work on construction, preparation of project documentation and engineering surveys, not included in the List of works affecting the safety of facilities capital construction .

(Order of the Ministry of Regional Development of the Russian Federation of December 30, 2009 N 624 "On approval of the List of types of work on engineering surveys, on the preparation of project documentation, on the construction, reconstruction, overhaul of capital construction projects that affect the safety of capital construction projects").

2) Secondly, work on the preparation of project documentation, construction, reconstruction and overhaul, regardless of whether they are included in the List or not, can be carried out without joining the SRO and obtaining permits in relation to:

  • objects that are not particularly dangerous, technically complex and unique objects in accordance with Article 48.1 of the Town Planning Code Russian Federation;
  • building a garage land plot provided by to an individual for purposes other than implementation entrepreneurial activity, or construction on a land plot provided for gardening, dacha farming
  • construction, reconstruction of objects that are not objects of capital construction (kiosks, sheds, etc.) (Objects for which the issuance of a building permit is not required in accordance with part 17 of article 51 of the Town Planning Code of the Russian Federation);
  • construction on the land plot of buildings and structures for auxiliary use (Objects for which the issuance of a building permit is not required in accordance with part 17 of article 51 of the Town Planning Code of the Russian Federation);
  • changes in capital construction objects and (or) their parts, if such changes do not affect the design and other characteristics of their reliability and safety and do not exceed the limit parameters of permitted construction, reconstruction established by the urban planning regulations (Objects for which the issuance of a building permit is not required in accordance with part 17 of article 51 of the Town Planning Code of the Russian Federation);
  • individual housing construction(detached residential buildings with no more than three floors, intended for no more than two families)
  • residential buildings with no more than three floors, consisting of several blocks, the number of which does not exceed ten and each of which is intended for one family, has a common wall (common walls) without openings with the neighboring block or neighboring blocks, is located on a separate land plot and has access to the territory common use(residential houses of blocked development) (Clause 2 of the Order of the Ministry of Regional Development of the Russian Federation of December 30, 2009 N 624);
  • apartment buildings with no more than three floors, consisting of one or more block sections, the number of which does not exceed four, each of which contains several apartments and common areas and each of which has a separate entrance with access to the common area (Clause 2 of the Order of the Ministry of Regional Development of the Russian Federation of December 30, 2009 N 624)
  • detached capital construction facilities with no more than two floors, the total area of ​​which is not more than 1500 sq.m., and which are not intended for citizens to live and carry out production activities, with the exception of objects that are especially dangerous, technically complex or unique objects (Art. 49 p. 2.4 No. 190-FZ "Urban Planning Code of the Russian Federation" dated December 29, 2004);
  • free-standing capital construction projects with no more than two floors, the total area of ​​which is not more than 1500 square meters, which are intended for the implementation of production activities, and for which the establishment of sanitary protection zones is not required, or for which within the boundaries land plots where such facilities are located, sanitary protection zones have been established or the establishment of such zones is required, with the exception of facilities that are especially dangerous, technically complex or unique facilities (Art. 49 p. 2.5 No. 190-FZ "Urban Planning Code of the Russian Federation" dated December 29, 2004).

Summarizing the above, we get a list of types of work that can be carried out without joining the SRO.

List of types of work for which SRO approval is not required.

1. Preparatory and final work:

  • Installation of electric lighting systems for temporary buildings.
  • Installation of temporary protective fences.
  • Geodetic center base for construction.
  • Geodetic control of the accuracy of the geometric parameters of buildings and structures.*
  • Stakeout works in the process of construction.*
  • Cleaning of premises and territory after construction and repair work.

2. Works on demolition of buildings and dismantling of structures:

  • Dismantling (dismantling) of buildings and structures, walls, ceilings, flights of stairs, landings, steps, dismantling of window, door and gate openings, partitions, suspended ceilings and other structural and related elements or parts thereof.*
  • Breaking walls, arrays, ceilings, punching nests.
  • Dismantling of the ground part of industrial buildings.
  • Dismantling of sidewalks, floors, roofing and cladding.
  • Dismantling of industrial furnaces.
  • Dismantling of lining of tunnels from cast-iron tubings.
  • Dismantling of metal columns, beams and frames.
  • Dismantling of contact network supports.
  • Land clearing and preparation for development.
  • Installation and dismantling of inventory external and internal scaffolding, technological garbage chutes.*
  • Construction of temporary: roads; sites; engineering networks and structures.*

3. Works on the development of excavations, vertical planning, compaction of soils of natural occurrence and arrangement of soil cushions:

  • Soil development by excavators in excavations, pits, trenches and dump or embankment.*
  • Soil excavation by excavators with loading onto a railway or automobile transport and export.*
  • Excavation and moving of soil by bulldozers and scrapers.*
  • Digging holes mechanized way, digging trenches with an excavator and a ditcher.
  • Paving slopes with stone and slabs with stops.
  • Strengthening drainage channels with trays - gutters, boards, shields and mats with heads.
  • Soil compaction with rollers, compactors or heavy rammers.*
  • Loosening of frozen soil with a wedge - a woman, rippers and drilling rigs.
  • Backfilling of soil manually with compaction by electric or pneumatic rammers.

4. Works on the construction of sinkholes and caissons:

  • Lowering a well with mechanized excavation.
  • Lowering the well manually.

5. Installation work wooden structures:

  • Assembly of residential and public buildings from factory-made parts of a complete delivery.*
  • Installation, strengthening and dismantling of structural elements and enclosing structures of buildings and structures, including those made of glued structures.*
  • Assembly of coverings and ceilings.
  • Installation of wooden structures, frames, rafters, chairs, beams, arches, trusses and panels.
  • Installation of visors, backlash - closets, fire boxes, tables.
  • Installation of rows, arrangement and development of stocks.
  • Installation of conductors, ladder ladders, running boards, barriers.
  • Arrangement of walls from wooden structures and parts.

6. Works on the installation of light enclosing structures:

  • Installation of argalite and asbestos-cement slabs and wall panels, coatings.
  • Installation of walls, ceilings, partitions and umbrellas from asbestos-cement sheets according to the finished frame.
  • Installation of sprinkler blocks from asbestos-cement sheets.

7. Works on the device of stone structures:

  • Installation of brick structures, including those with cladding.*
  • Installation of partitions made of bricks, ceramic stones, piece gypsum and lightweight concrete slabs.
  • Jumper installation.
  • Arrangement of structures of buildings and structures made of natural and artificial stones, including those with cladding.*
  • Wall masonry made of ceramic stones, foam concrete, aerated concrete and expanded clay concrete blocks.
  • Masonry structures made of natural and artificial stone.
  • Installation of circles and formwork for laying arches, vaults and walls of industrial furnaces.
  • Laying of foundations, basement walls, retaining walls, laying of workings with rubble stone.
  • Brick laying of channels, pits, furnaces, hearths, chimneys with cuttings.
  • Arrangement of heating furnaces and hearths.*

8. Works on shielding rooms and arrangement of expansion joints:

  • Sealing of horizontal and vertical joints and seams between panels, windows, doors.
  • The device of deformation and anti-seismic seams.
  • Screening of floors, walls, doors, ceilings with copper or steel sheets and mesh.
  • Installation of protective steel meshes.
  • Sheathing of walls and roofing of workings with sheet steel.
  • Surface cladding with natural and artificial stones and linear shaped stones.*
  • Installation of ventilated facades.*

9. Roofing works:

  • Installation of roofs from piece and sheet materials.*
  • Liquid roof installation.*
  • Asbestos cement roofing.
  • The device of roofs from a tile with the device of an obreshetka.
  • Roll roofing installation.*
  • The device of roofs from bituminous mastic with laying of fiberglass mesh or fiberglass.
  • The device of small roofing coverings and linings on the facades of roofing iron.
  • Installation of gutters with overhangs and roof railings.
  • Priming of bases and vapor barrier device.

10. Works on anti-corrosion protection of building structures and equipment:

  • Painting surfaces with varnishes, paints, enamels. Protective coating with paintwork materials.*
  • Coloring steel structures, including bridges, supports, masts, towers.
  • Hydrophobization and fluatization of the surface.
  • Impregnation of crushed stone with mastic "BITUMINOL N-2".

11. Works on thermal insulation of building structures, pipelines and equipment:

  • Works on thermal insulation of pipelines.*
  • Surface coating of pipeline insulation with asbestos-cement casings, glass cement, fiberglass, fiberglass.
  • Covering the surface of pipeline insulation with sheet metal or corrugated aluminum sheets.
  • Surface coating of pipeline insulation, wrapping and pasting the insulation with films, fabrics, roll materials.

12. Works on the arrangement of internal engineering systems and equipment:

  • Laying of internal wiring.
  • The device of the power supply system with voltage up to 1 kV inclusive.*
  • Installation of the input distribution device.
  • Installation of distribution and lighting shields, terminal boxes and taps.
  • Installation of cabinets, consoles, racks.
  • Installation of knife switches, switches, automatic air devices, plug devices.
  • Installation of ballast and guide equipment.
  • Installation of electrical appliances and meters.
  • Installation of grounding conductors.
  • Installation of insulators.
  • Laying of cables fixed on a cable or staples.
  • Arrangement of electrical and other control networks for life support systems of buildings and structures.*
  • Installation of a lightning rod, cable platform, manholes, steps, control and break point on the supports and roofs of buildings.
  • Installation of lightning protection parts for beam and loop grounding.
  • Installation of short-circuiters, disconnectors, switches, arresters for voltage up to 750 kV.
  • Installation of accumulators, alkaline batteries with charging.
  • Installation of electric heaters, electric stoves.
  • Installation of embedded and selected devices of automation systems, fire extinguishing installations, equipment for grease lubrication systems.
  • Filling containers with foaming agent.
  • Installation of fans and ventilation units, supply irrigation chambers, maintenance, leveling, recirculation.
  • Installation and dismantling of the ventilation and air conditioning system.*
  • Installation of heaters and air heaters.
  • Installation of filters, scrubbers, cyclones.
  • Installation of air collectors from steel pipes and air vents and hydraulic seals.
  • Installation and dismantling of the heating system.*
  • Installation of heating water and steam boilers.
  • Installation of heating cast-iron sectional steam boilers.
  • Installation and dismantling of the water supply and sewerage system.*
  • Laying of pipelines from plastic and metal-plastic pipes.
  • Laying of pipelines from non-ferrous metals and cast iron.
  • Laying of pipelines from steel pipes, with welding of joints and installation of bends.
  • Laying of pipelines from steel pipes with flanges and welded joints from finished units and parts.
  • Installation of shut-off, control and safety valves on internal networks.
  • Installation of water meter units, metering units and water meters.
  • Installation of compensators.
  • Installation of elevator units.
  • Installation of pointing devices (pressure gauges, thermometers, level indicators, air valves).
  • Installation of pressure and reduction regulators.
  • Installation of centrifugal pumps with piping.
  • Installation of filters, water and oil separators, compensators, bypass devices when laying pipelines.
  • Installation of water filters, softeners and water composition adjustments.
  • Installation of high-speed and capacitive water heaters, installation of boilers.
  • Insertion and connection of pipelines to existing pipelines.
  • Installation of risers in finished channels on floors with the installation of shields.
  • Installation of steam and water distribution combs from steel pipes.
  • Installation of distributing boxes, equipment exhausts, brackets, supports, vibration-isolating bases, valves, dampers, hermetic doors and hatches.
  • Testing hydraulic and pneumatic pipelines in compliance with the requirements of Rostekhnadzor for this type of activity.

13. Works on installation of external engineering networks and communications:

  • The device of power supply networks with voltage up to 1 kV inclusive.
  • The device of external communication lines, including telephone, radio and television. *
  • Installation of pipelines by horizontal directional drilling.

14. Works on the installation of technological equipment:

  • Installation of electrical installations.
  • Installation of compressor machines, pumps, general purpose pumping units and fans.*
  • Installation of compressor units and expanders piston, centrifugal.
  • Installation of ventilation equipment.
  • Installation of communication equipment, telephone exchanges and switches of the MB system for directorial, dispatching and office communications and telephone and quasi-telephone exchanges.
  • Installation of instruments, means of automation and computer technology.
  • Installation of indicators, sensors, signaling devices of various parameters.
  • Installation of equipment for operational control and management, collection and transmission of initial information.
  • Installation of panels, shields, tripods, consoles.
  • Installation of video surveillance systems.
  • Installation of control systems and access restrictions.
  • Installation of equipment for electrical alarm, fire, calling and remote signaling with blocking surfaces.
  • Installation of equipment for agricultural production, including fish processing and fish storage.*
  • Installation of equipment for food industry enterprises.*
  • Installation of equipment for enterprises in the communications industry.*
  • Installation of communication equipment for mines and railway transport.
  • Installation of equipment for electronic industry enterprises.*
  • Installation of equipment for enterprises and objects of consumer services and utilities.*
  • Installation of equipment for healthcare institutions and medical industry enterprises.*
  • Installation of equipment for cinematography enterprises.*
  • Installation of equipment for communication facilities.*

15. Commissioning works:

  • Commissioning works electrical devices.
  • Commissioning of automation in power supply.*
  • Commissioning works automated systems control, signaling and interconnected devices.*
  • Commissioning works software computing complexes.
  • Start-up and adjustment works of autonomous system adjustment.*
  • Commissioning works of complex adjustment of systems.*
  • Commissioning and testing of ventilation and air conditioning systems.*
  • Commissioning of refrigeration units.*
  • Commissioning of heat power equipment.
  • Commissioning of hot water boilers.*
  • Commissioning works of auxiliary boiler equipment.*
  • Commissioning of telemechanics.*
  • Adjustment of ventilation and air conditioning systems.*

16. Glazing:

  • Installation of window and door blocks.
  • Double and triple glazing, including double-glazed windows, window and balcony blocks.
  • The glazing is single, including double-glazed windows, bindings of greenhouses, industrial buildings and partitions.
  • Glazing door panels and stained glass windows.
  • Coating of roofs, walls, partitions with polymeric materials.
  • The device of entrance groups.
  • Installation of office partitions.

17. Plaster work:

  • Plastering of internal and external surfaces of buildings.
  • Solid leveling and preparation of surfaces for painting or wallpapering.
  • Plastering of facade surfaces on stone and concrete.
  • Plastering ovens with clay mortar.
  • Plaster and screed X-ray protective.

18. Arrangement of bases, coatings and floors:

Screed device.

  • The device of floors from linoleum and plastics.
  • Arrangement of parquet, panel and plank floors.
  • Installation of floors from ceramic, porcelain stoneware, granite and marble slabs.
  • The device of floors seamless, polymeric, polymeric.
  • Installation of epoxy self-leveling floors.
  • The device of sports floor coverings.
  • Artificial turf and sports surfaces stadiums and sports fields.
  • Installation of floors and window sills from concrete and mosaic tiles.
  • The device of coverings from a cobble stone and a stone blocks.
  • The device of the soil bases, earthen and crushed stone coverings.
  • Installation of floors from cast-iron and steel stamped tiles.
  • Installation of asphalt concrete and xylolite pavements.

19. Facing work:

  • Facing surfaces with gypsum and gypsum-fiber sheets.
  • Surface cladding with ceramic tiles.
  • Marble cladding, artificial marble, granite, artificial granite.
  • Installation of false ceilings.
  • Wall cladding with siding.
  • Wall cladding with composite materials and plastic.
  • Wall cladding with wall and ceiling panels, clapboard, false beams.
  • Facing stoves and hearths with tiles.
  • Cladding of wall and ceiling frames with acoustic boards and materials.
  • Facing surfaces of walls, columns, pilasters with natural and artificial stone.
  • Cladding of wall and ceiling surfaces with chipboard, fibreboard and plywood.
  • Cladding of walls and ceilings with duralumin sheets.
  • Works on the installation of walls from panels of the "SANDWICH" type and sheet assembly.
  • Installation of ventilated facades.

20. Stucco work:

  • Installation of polymer, gypsum and cement molded parts.
  • Installation of polymer, plaster and cement piece parts, rosettes, capitals, bases, cones, crackers, brackets, lattices, vases, coats of arms.

21. Other, painting and wallpaper work:

  • Installation of doors, design of doorways.
  • Stretch ceilings.
  • Installation commercial equipment, shelving and railings.
  • Warehouse equipment.
  • Installation of lamps and lighting equipment.
  • Installation of outdoor lighting devices for buildings and structures.
  • Installation of plumbing fixtures.
  • Installation of sanitary partitions.
  • Installation of safes.
  • Painting facades and exterior surfaces of buildings.
  • Painting of external surfaces of reinforced concrete structures.
  • Interior painting.
  • Pasting walls, ceilings with wallpaper, linkrust, fabrics, cork and other materials.

22. The device of fences and fences:

  • Installation of manual, mechanical and automatic barriers, gates, gates, turnstiles, chain barriers.
  • The installation of protective and decorative fences, fences, gates from various materials, except for protective fences and elements of the arrangement of roads and building envelopes.
  • The device of protective and protective and decorative protections of windows.
  • Installation of snow shields and fences with their manufacture.
  • Installation of additional reinforced concrete pillars.

23. Landscaping, protective and fruit plantations, landscaping:

  • Planting trees and shrubs with the preparation of seats and planting material.
  • Planting seedlings and seedlings.
  • Forest planting of seedlings and saplings is mechanized.
  • Arrangement of lawns, flower beds and care for them.
  • Aeroseeding of coniferous trees.
  • Care of trees and shrubs.
  • Soil cultivation, including fertilization.
  • The device of systems of watering and irrigation.
  • Installation and dismantling of tapestries, racks, poles, anchors and braces.
  • Covering terraces with wooden and composite flooring.
  • The device of greenhouses from various materials.
  • Arrangement of playgrounds, places of leisure and recreation, places of public use.
  • Installation of small architectural forms, fountains, artificial reservoirs.
  • Arrangement of garbage containers.

24. Construction of road bases and pavements, with the exception of motor roads and airfields:

  • Arrangement of cobbled and mosaic pavements, platforms, paths.
  • Installation of concrete slab sidewalks and paths.
  • The device of the leveling layers from asphalt.
  • The device of the bases and coverings from asphalt concrete mix.
  • Installation of cement-concrete bases and coatings.
  • Installation of side stones.
  • Baffle device.
  • Maintenance and road maintenance.
  • The device of the bases and coverings from sand and gravel mix.
  • The device of the bases and coverings of crushed stone.
  • The device of soil-bitumen and soil-cement bases and coatings.
  • Paving of coverings from a natural stone.

If you are a professional participant in the field of construction, reconstruction, overhaul, demolition, design of buildings and structures, including construction of roads, hydraulic engineering, facade and other works, there must have been situations when your customer or general contractor asked you such Question: Do you have an SRO? In this article we will try to figure out how such a question is legitimate and whether you need membership in the SRO.

First of all, it is necessary to understand what an SRO is and why SROs are needed at all (we remind you that in this article we are talking mainly about construction SROs). SRO is an abbreviation for self-regulatory organization. A self-regulatory organization is non-profit organization, details of which are included in State Register self-regulatory organizations of a certain type, and which is an association of business entities of one industry or business entities professional activity of a certain type, which, in fact, are its members with absolutely equal rights and obligations.

Thus, SRO is an association of legal entities and individual entrepreneurs, employed, for example, in the construction industry, and pursuing common goals. The objectives of the self-regulatory organization in the field of engineering surveys, architectural and construction design, construction, are indicated in Article 55.1 of the Town Planning Code of the Russian Federation and boil down to improving the quality of work performed, preventing damage to life, health and property and acting as a guarantor of the fulfillment of obligations of its members under contracts and tenders.

To improve the quality and safety level of the work carried out, the SRO apparatus, through periodic inspections, monitors the compliance of its members with the requirements for equipment, specialists and other indicators (the requirements are established by the NPA of the Russian Federation and local acts of the SRO, mandatory for all its members). And, most importantly, and costly for a member of the SRO - SRO with the help of compensation funds SRO is jointly and severally liable for the obligations of its members arising from the infliction of harm, as well as subsidiary liability for the obligations of its members in cases (read more about SRO compensation funds in our article).

Having figured out a little what SRO is, we will find out whether it is right for you ( legal entity or individual entrepreneur). So, you do NOT need an SRO in the following cases:

1. If the amount of obligations under the contract in which you are the executor does not exceed three million rubles;

2. If you carry out construction and repair:

  • a garage, a garden house and other buildings on a land plot provided to an individual for purposes not related to entrepreneurial activities;
  • objects of individual housing construction (for example, a detached residential building not higher than three floors);
  • objects that are not objects of capital construction (for example, a temporary building, a canopy);
  • buildings and structures for auxiliary use (for example, a greenhouse).

3. In some cases, if your organization is a State Unitary Enterprise, MUP, has in authorized capital more than fifty percent of the share of public legal education (more similarly described in part 2.2 of article 52 of the Town Planning Code);

Today, many builders are wondering whether it is necessary to join the SRO and whether it is possible not to join the SRO. Let's try to summarize the available, but scattered information on this matter.

We, as lawyers, are often approached by the heads of construction companies that perform various auxiliary work at construction sites with one single question: “Does our company have to join an SRO? Can we work without a SRO permit for construction work? Answer - Yes, you can, if you:

1. Build a garage on a land plot provided to an individual.
2. Build on the land provided for gardening, dacha farming;
3. Build or reconstruct objects that are not objects of capital construction (kiosks, sheds, and others);
4. Build facilities and structures for auxiliary use;
5. Change capital construction objects and (or) their parts, but if such changes do not affect the design and other characteristics of their reliability and safety, do not violate the rights of third parties and do not exceed the limit parameters of permitted construction, reconstruction established by the urban planning regulations;
6. Build a detached residential building. The number of floors in it is not more than three. It is designed to accommodate no more than two families;
7. Build a detached residential building. The number of floors in it is not more than three. The house can consist of several blocks, but not more than ten. Each of the blocks is designed for one family. It also has a common wall(s) without openings with the neighboring block(s). The residential building is located on a separate land plot and has access to the common area.
8. Build apartment house. It has no more than three floors. The house consists of one or more block sections, but no more than four. Each block section contains several apartments and common areas. Each block section has a separate entrance with access to the common area.
9. Produce following works(concerns construction, reconstruction and overhaul):

  • p.1.1 Layout work in the process of construction;
  • p.1.2 Geodetic control of the accuracy of the geometric parameters of buildings and structures;
  • p.2.1 Dismantling (dismantling) of buildings and structures, walls, ceilings, flights of stairs and other structural and related elements or parts thereof;
  • p.2.2 Construction of temporary: roads; sites; engineering networks and structures;
  • p.2.4 Installation and dismantling of inventory external and internal scaffolding, technological garbage chutes;
  • p.3.1 Mechanized excavation;
  • p.3.5 Soil compaction with rollers, compactors or heavy rammers;
  • clause 9.1 Arrangement of structures of buildings and structures made of natural and artificial stones, including those with cladding;
  • p.9.2 Arrangement of brick structures, including those with cladding;
  • clause 9.3 Arrangement of heating furnaces and hearths;
  • p.11.1 Installation, strengthening and dismantling of structural elements and enclosing structures of buildings and structures, including those made of glued structures;
  • p.11.2 Assembly of residential and public buildings from prefabricated parts of a complete delivery;
  • p.12.3 Protective coating with paints and varnishes;
  • item 12.11 Works on thermal insulation of pipelines;
  • p.13.1 Installation of roofs from piece and sheet materials;
  • item 13.2 Installation of roofs from rolled materials;
  • p.13.1 Installation of self-leveling roofs;
  • p.14.1 Facing surfaces with natural and artificial stones;
  • p.14.2 Installation of ventilated facades;
  • p.15.1 Arrangement and dismantling of the water supply and sewerage system;
  • p.15.2 Arrangement and dismantling of the heating system;
  • p.15.4 Installation and dismantling of the ventilation and air conditioning system;
  • p.15.5 Arrangement of the power supply system;
  • p.15.6 Arrangement of electrical and other control networks for life support systems of buildings and structures;
  • clause 20.1 Arrangement of power supply networks with voltage up to 1 kV inclusive;
  • p.20.13 Arrangement of external communication lines, including telephone, radio and television;
  • item 23.5 Installation of compressor units, pumps and fans;
  • p.23.6 Installation of electrical installations, equipment, automation and alarm systems;
  • p.23.24 Installation of equipment for food industry enterprises;
  • p.23.27 Installation of equipment for cinematography enterprises;
  • p.23.28 Installation of equipment for enterprises in the electronics industry and the communications industry;
  • p.23.29 Installation of equipment for healthcare institutions and medical industry enterprises;
  • p.23.30 Installation of equipment for agricultural production, including fish processing and storage of fish;
  • p.23.31 Installation of equipment for consumer services and public utilities;
  • p.23.33 Installation of equipment for communication facilities;
  • clause 24.7 Commissioning of automation in power supply;
  • clause 24.10 Commissioning of automation systems, alarm systems and related devices;
  • Clause 24.11 Commissioning of autonomous system adjustment;
  • p.24.12 Commissioning works of complex adjustment of systems;
  • clause 24.13 Commissioning of telemechanics;
  • p.24.14 Adjustment of ventilation and air conditioning systems;
  • p.24.18 Commissioning of refrigeration units;
  • item 24.21 Commissioning of hot water boilers;
  • p.24.22 Commissioning of boiler auxiliary equipment;

So these works do not require SRO approval if they are NOT carried out at especially dangerous, technically complex and unique facilities. If the listed works are carried out at especially dangerous, technically complex and unique objects, then the SRO approval is required. If you need to join the SRO of builders, we suggest using the cost calculation form.

They are listed below:

1) facilities using atomic energy (including nuclear installations, storage facilities for nuclear materials and radioactive substances);
2) hydraulic structures of the first and second classes, installed in accordance with the legislation on the safety of hydraulic structures;
3) line-cable communication facilities and communication facilities, determined in accordance with the legislation of the Russian Federation;
4) power lines and other electric grid facilities with a voltage of 330 kilovolts or more;
5) objects of space infrastructure;
6) airports and other aviation infrastructure facilities;
7) objects of public railway transport infrastructure;
8) subways;
9) seaports, with the exception of sea specialized ports intended for servicing sports and pleasure craft;
10) thermal power plants with a capacity of 150 megawatts and more;
11) dangerous production facilities, where:
* obtained, used, processed, formed, stored, transported, destroyed hazardous substances in quantities exceeding the limit. Such substances and limit quantities of hazardous substances are specified in annexes 1 and 2 to federal law dated July 21, 1997 N 116-FZ "On the industrial safety of hazardous production facilities"
Gas distribution systems that use, store, transport natural gas under pressure up to 1.2 megapascal inclusive or liquefied hydrocarbon gas under pressure up to 1.6 megapascal inclusive do not belong to especially dangerous and technically complex facilities;
* melts of ferrous and non-ferrous metals and alloys based on these melts are obtained;
* mining, mineral processing, and underground operations are underway;
* permanently installed cable cars and funiculars are used.

The unique objects are :
capital construction projects, the project documentation of which provides for at least one of the following characteristics:
1) height more than 100 meters;
2) spans over 100 meters;
3) the presence of a console more than 20 meters;
4) deepening of the underground part (in whole or in part) below the planning mark of the earth by more than 10 meters;
5) the presence of structures and structural systems for which non-standard calculation methods are applied taking into account physical or geometric non-linear properties or special calculation methods are developed.

If in the lists of work, you did not find those types of work that do not require permission from the SRO, but which you produce, then you need to join the SRO.

Clauses 1-5 (Part 17 of Article 51 of the Town Planning Code of the Russian Federation)
P. 7-9 (Order No. 624 of the Ministry of Reg. Development of the Russian Federation of December 30, 2009)
Particularly dangerous, technically complex and unique objects are listed in accordance with Article 48.1 of the Civil Code of the Russian Federation.
If, after reading the article, you understand that your company needs an SRO permit, we suggest using

Let's look into this issue:

Let us describe the situations when builders do not need to obtain a SRO permit.

Order of the Ministry of Regional Development
Russian Federation dated December 30, 2009 No. 624

SRO approval is not required:

1. UNLESS A CONSTRUCTION PERMIT IS REQUIRED.

Construction, reconstruction, overhaul works are carried out in relation to objects where the issuance of a building permit is not required in accordance with paragraphs 1 - 4, 5 of part 17 of article 51 of the Town Planning Code of the Russian Federation.

If a company performs construction work at facilities for which it is not necessary to obtain a building permit, then, accordingly, to perform construction works SRO approval is not required for these facilities.

Which construction sites do not require a building permit and, as a result, do not require SRO approval?

A building permit is not required if:

a) construction of a garage on a land plot provided to an individual for purposes not related to entrepreneurial activities, or construction of a dacha economy on a land plot provided for gardening;

b) construction, reconstruction of objects that are not objects of capital construction (kiosks, sheds, trailers and others);

c) construction on the land plot of buildings and structures for auxiliary use;

d) changes in capital construction objects and (or) their parts, if such changes do not affect the design and other characteristics of their reliability and safety and do not exceed the limit parameters of permitted construction, reconstruction established by the urban planning regulations;

e) in other cases, if, in accordance with the Town Planning Code, the legislation of the constituent entities of the Russian Federation on town planning activities, obtaining a building permit is not required.

So, if a construction company performs the above works at facilities where it is not necessary to obtain a building permit, then there is no need to join an SRO and obtain a permit for construction work.

2. FOR LOW-STORY CONSTRUCTION:

1. In relation to objects of individual housing construction (detached residential buildings with no more than three floors, intended for no more than two families);

2. In relation to residential buildings with no more than three floors, consisting of several blocks, where their number does not exceed ten and each is intended for one family, has a common wall (common walls) without openings with the neighboring block or neighboring blocks, located on a separate land plot and has access to a common area (residential houses of blocked development);

3. In relation to apartment buildings with no more than three floors, consisting of one or more block sections, the number of which does not exceed four, each of which contains several apartments and common areas and each of which has a separate entrance with access to common area.

* However, according to the Town Planning Code of Russia and the classifier of works, objects with a certain roofing (roofing) are removed from low-rise construction, which does not require SRO approval:

  • in the form of ribbed-ring and ribbed domes,
  • shells of double curvature,
  • mesh domes,
  • membrane coatings,
  • hanging structures,
  • coverings from glued wood elements, including crossbars, arches, frames.

3. FOR CERTAIN TYPES OF WORKS CARRIED OUT AT CAPITAL CONSTRUCTION OBJECTS NOT RELATED TO ESPECIALLY DANGEROUS, TECHNICALLY COMPLEX AND UNIQUE

In the list of works approved by the Order of the Ministry of Regional Development of the Russian Federation dated December 30, 2009 No. 624 "On approval of the List of types of work on engineering surveys, on the preparation of project documentation, on the construction, reconstruction, overhaul of capital construction facilities that affect safety capital construction objects", there are types of work, at the end of the name of which the asterisk icon is set <*>.

This icon indicates thatthese types and groups of types of work require obtaining a Certificate of admission to the types of work affecting the safety of the capital construction object, in the event that such work is performed at the facilities specified in Town Planning Code of the Russian Federation


ATTENTION:

However, in some situations, construction companies that perform work that does not require SRO approval have to join SROs. This, as a rule, concerns companies that have a "finicky" customer or participate in tenders. Organizers of tenders and similar customers in the vast majority of cases set for participants required condition– membership in the SRO, even if the work is performed at facilities that do not provide for mandatory entry into the SRO. In this case, the organizers of tenders can be understood, since their property interests are more protected when working with construction company member of an SRO than when working with builders who have not joined a self-regulatory organization.

This fact must be taken into account
in deciding the feasibility

Below is a list of works for which a permit is not required in the preparation of project documentation, as well as engineering surveys:

  • Construction of a garage on a land plot provided to an individual for possession or long-term lease for non-commercial purposes and entrepreneurial activities. It can also be the construction of dacha facilities and gardening;
  • Construction of sheds, kiosks, as well as other objects that do not belong to the category of capital construction objects and do not require the issuance of a permit for construction and design work;
  • Erection of auxiliary buildings (in accordance with Article 51 of the Town Planning Code of the Russian Federation on objects that do not require obtaining permits for design and construction work);
  • Reconstruction and repair of capital construction objects, as well as their elements. Changes should not affect the design and other characteristics of reliability, safety, exceed the maximum allowable parameters of permitted construction, reconstruction, established Urban Planning Code;
  • In other cases, according to the Civil Code of the Russian Federation, the legislation of the constituent entities of the Russian Federation on urban planning does not require a permit for construction and design work;
  • Objects of individual housing construction (detached residential buildings, where the number of floors does not exceed 3). Such houses can be intended for no more than two families (according to the Order of the Ministry of Regional Development of the Russian Federation);
  • Residential buildings, where the number of storeys does not exceed 3. Such houses can consist of several blocks (there can be no more than 10 and each is intended for one family). Such a structure may have common walls with a neighboring house without openings or adjacent blocks. It must be located on a separate land plot, have access to a territory intended for common use (residential buildings of a blocked building);
  • Apartment buildings where the number of floors does not exceed three. The house may consist of several block-sections or one, the total number should not exceed 4. Each block may contain several apartments, public premises, an entrance with access to the common area.

List of works for which a design permit is not required

Below is a list of works that do not affect safety, which means that when designing, you do not need to obtain a self-regulatory partnership permit:

  • Training internal systems power supply;
  • Low current systems;
  • Preparation of projects for the organization of construction, service life extension, conservation, demolition, dismantling of structures and buildings;
  • Works in the field landscape design and landscape design;
  • Design of projects of structures and interiors of buildings;
  • Drawing up estimates for construction, survey, design work. Maintenance of budget documentation;
  • Geodetic monitoring of deformations and settlement of structures and buildings, movements of the earth's surface, hazardous natural processes;
  • topographic, geodetic works in the field of reconstruction of buildings and structures, as well as construction;
  • Study of the state, composition of soils under standing buildings and structures.

When is a permit required?

If the project company performs the work included in the List approved by the Order of the Ministry of Regional Development, a certificate of admission to carry out design work must be obtained without fail. Ignoring this rule may result in a security breach that will result in administrative penalties and, in severe cases, criminal liability.

This list contains the names of design works, works related to the reconstruction and overhaul. In order to start implementing them, you need to enter into a self-regulatory partnership and obtain the appropriate certificate - a work permit. The permission is indefinite.

Separate types works in the presented list are marked as "*", which means the need to obtain permits when carrying out works belonging to the category of unique, dangerous and technically complex. So, from a technical point of view, especially dangerous and complex objects are the following:

  • communication facilities belonging to the category of technically complex, especially dangerous according to Russian legislation;
  • subways;
  • hydrotechnical objects of the first and second class, installed in accordance with the legislative norms for the safety of hydraulic structures;
  • seaports, except for special ports established for servicing recreational and sporting vessels;
  • nuclear facilities, which include storage facilities for radioactive substances, waste and nuclear materials;
  • power grid facilities and power lines (voltage above 330 kilovolts;
  • objects of aviation and space infrastructure;
  • thermal power plants (with a capacity of 150 megawatts or more);
  • hazardous production facilities where the creation, processing, use, storage, transportation, destruction of an exorbitant amount of hazardous substances takes place. Substances are described in detail in Annexes 1 and 2 to the Federal Law N 116-FZ on industrial safety of hazardous production facilities.

It should be noted that technically complex and dangerous objects do not belong to:

  1. gas distribution systems for the use, storage, transportation natural gas under a pressure of 1.2 megapascals, including liquefied petroleum gas under a pressure of not more than 1.6 MPa.
  2. facilities where ferrous and non-ferrous alloys are produced, mining and underground operations are carried out, and mineral processing operations are carried out.

Unique objects include capital construction objects, the design documentation of which contains at least one of the following parameters:

  • spans from 100 meters;
  • height from 100 meters;
  • consoles over 20 meters;
  • with partial or complete deepening of the underground part below the planning mark by 15 meters.

Thus, in order to get an answer to the question of the need to join the SRO of designers and obtain permission to conduct design work, you should first of all familiarize yourself with the list of types of work approved by the Order of the Ministry of Regional Development and act in accordance with established legislation.

You can join an SRO and get permission to work both on your own and with the involvement of specialized companies that will not only help you choose a specialized partnership, depending on the characteristics of the organization’s activities, but will competently draw up all the necessary papers.